{"id":40853,"date":"2025-10-27T11:53:44","date_gmt":"2025-10-27T06:23:44","guid":{"rendered":"https:\/\/edunovations.com\/currentaffairs\/?p=40853"},"modified":"2025-10-27T11:53:46","modified_gmt":"2025-10-27T06:23:46","slug":"adani-godda-power-plant","status":"publish","type":"post","link":"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/","title":{"rendered":"Adani Godda Power Plant Approved for Indian Grid Connection: Strategic Energy Move"},"content":{"rendered":"\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_83 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Adani_Godda_Power_Plant_approved_for_Indian_grid_connection_enhancing_domestic_energy_security_dual_supply_to_Bangladesh_and_supporting_Indias_sustainable_power_goals\" >Adani Godda Power Plant approved for Indian grid connection, enhancing domestic energy security, dual supply to Bangladesh, and supporting India\u2019s sustainable power goals.<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Overview_of_the_Approval\" >Overview of the Approval<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Why_This_News_is_Important\" >Why This News is Important<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Strategic_Energy_Integration\" >Strategic Energy Integration<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Economic_Implications\" >Economic Implications<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Environmental_Considerations\" >Environmental Considerations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Impact_on_Cross-Border_Energy_Trade\" >Impact on Cross-Border Energy Trade<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Regulatory_and_Policy_Developments\" >Regulatory and Policy Developments<\/a><\/li><\/ul><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Historical_Context\" >Historical Context<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Key_Takeaways_from_%E2%80%9CAdanis_Godda_Power_Plant_Approved_for_Indian_Grid_Connection%E2%80%9D\" >Key Takeaways from &#8220;Adani&#8217;s Godda Power Plant Approved for Indian Grid Connection&#8221;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#FAQs_Frequently_Asked_Questions\" >FAQs: Frequently Asked Questions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/adani-godda-power-plant\/#Some_Important_Current_Affairs_Links\" >Some Important Current Affairs Links<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Adani_Godda_Power_Plant_approved_for_Indian_grid_connection_enhancing_domestic_energy_security_dual_supply_to_Bangladesh_and_supporting_Indias_sustainable_power_goals\"><\/span>Adani Godda Power Plant approved for Indian grid connection, enhancing domestic energy security, dual supply to Bangladesh, and supporting India\u2019s sustainable power goals.<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Adani&#8217;s Godda Power Plant Approved for Indian Grid Connection<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Overview_of_the_Approval\"><\/span>Overview of the Approval<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Government of India has granted Adani Power Limited (APL) approval to connect its 1,600 MW Godda Ultra Super Critical Thermal Power Plant in Jharkhand to the national electricity grid. This decision, announced on October 17, 2025, marks a significant shift from the plant&#8217;s original purpose of exclusively supplying power to Bangladesh. The connection will be established through a Line-In Line-Out (LILO) arrangement of the Kahalgaon A\u2013Maithon B 400 kV transmission line. The approval is valid for 25 years and is granted under Section 164 of the Electricity Act, 2003 <\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\" id=\"Adani-Godda-Power-Plant\"><img decoding=\"async\" src=\"https:\/\/encrypted-tbn0.gstatic.com\/images?q=tbn:ANd9GcRJXDc59yatszHnSYnAgRz0GIgbAgJ2_6SYHA&amp;s\" alt=\"Adani Godda Power Plant\" title=\"Adani Godda Power Plant\"\/><figcaption class=\"wp-element-caption\">Adani Godda Power Plant<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_This_News_is_Important\"><\/span>Why This News is Important<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Strategic_Energy_Integration\"><\/span>Strategic Energy Integration<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The approval to connect the Godda power plant to India&#8217;s national grid represents a strategic move to enhance domestic energy security. By diversifying its power distribution, Adani Power can contribute to meeting India&#8217;s growing electricity demand, especially in regions facing supply shortages.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Economic_Implications\"><\/span>Economic Implications<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">This development is expected to have positive economic implications. It may lead to reduced electricity costs in the domestic market by replacing more expensive power sources with the Godda plant&#8217;s electricity. Additionally, the project is likely to create employment opportunities during the construction and operational phases.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Environmental_Considerations\"><\/span>Environmental Considerations<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The Godda plant is an ultra-supercritical thermal power station, which means it operates at higher efficiencies and emits less CO\u2082 per unit of electricity generated compared to conventional coal-fired plants. This aligns with India&#8217;s commitment to reducing carbon emissions and transitioning towards cleaner energy sources.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Impact_on_Cross-Border_Energy_Trade\"><\/span>Impact on Cross-Border Energy Trade<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">While the plant will continue to supply power to Bangladesh, the new domestic connection allows for a more balanced energy trade. It ensures that both neighboring countries benefit from the shared energy resources, fostering stronger bilateral ties and regional cooperation in energy security.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Regulatory_and_Policy_Developments\"><\/span>Regulatory and Policy Developments<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The approval process involved multiple regulatory changes, including granting Adani Power the same authority as the telegraph authority under the Indian Telegraph Act, 1885, for placing transmission lines. This reflects the government&#8217;s proactive approach to facilitating infrastructure development while ensuring compliance with legal and environmental standards <\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Historical_Context\"><\/span>Historical Context<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Godda Thermal Power Station, located in Jharkhand, was commissioned primarily to export electricity to Bangladesh under a long-term agreement. In March 2019, the Central Government declared the plant as a Special Economic Zone (SEZ), further emphasizing its role in cross-border energy trade <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Over time, the dynamics of energy demand and supply in both India and Bangladesh have evolved. India&#8217;s increasing electricity requirements and the need for a more resilient energy infrastructure have prompted the government to reconsider the exclusive export arrangement. The decision to connect the Godda plant to the Indian grid reflects this shift towards a more integrated and self-reliant energy strategy.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Takeaways_from_%E2%80%9CAdanis_Godda_Power_Plant_Approved_for_Indian_Grid_Connection%E2%80%9D\"><\/span>Key Takeaways from &#8220;Adani&#8217;s Godda Power Plant Approved for Indian Grid Connection&#8221;<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>S.No<\/th><th>Key Takeaway<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td><strong>Government Approval<\/strong>: The Indian government has approved the connection of Adani Power&#8217;s Godda plant to the national grid through a Line-In Line-Out (LILO) arrangement.<\/td><\/tr><tr><td>2<\/td><td><strong>Duration of Approval<\/strong>: The approval is granted for 25 years under Section 164 of the Electricity Act, 2003.<\/td><\/tr><tr><td>3<\/td><td><strong>Dual Supply Model<\/strong>: The Godda plant will continue to supply electricity to Bangladesh while also contributing to India&#8217;s domestic power needs.<\/td><\/tr><tr><td>4<\/td><td><strong>Regulatory Changes<\/strong>: Adani Power has been granted the same authority as the telegraph authority under the Indian Telegraph Act, 1885, for placing transmission lines.<\/td><\/tr><tr><td>5<\/td><td><strong>Strategic Energy Planning<\/strong>: This move aligns with India&#8217;s broader strategy to enhance energy security and infrastructure resilience.<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Adani Godda Power Plant<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs_Frequently_Asked_Questions\"><\/span>FAQs: Frequently Asked Questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>1. What is the Godda Power Plant?<\/strong><br>The Godda Power Plant is a 1,600 MW Ultra Super Critical Thermal Power Station located in Jharkhand, primarily developed by Adani Power Limited. Initially, it was intended to supply electricity exclusively to Bangladesh.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>2. When was the Godda plant approved for connection to the Indian national grid?<\/strong><br>The Government of India approved the connection of the Godda plant to the national grid on October 17, 2025.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>3. What is the Line-In Line-Out (LILO) arrangement?<\/strong><br>LILO is a transmission line configuration that allows a new connection to be inserted into an existing high-voltage transmission line without disturbing the original flow, in this case between Kahalgaon A\u2013Maithon B 400 kV line.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>4. How long is the approval valid?<\/strong><br>The approval for connecting the Godda plant to the national grid is valid for 25 years under Section 164 of the Electricity Act, 2003.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>5. Will the Godda plant still supply power to Bangladesh?<\/strong><br>Yes, the plant will continue supplying electricity to Bangladesh while also contributing to India\u2019s domestic power requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>6. What are the environmental benefits of the Godda plant?<\/strong><br>Being an ultra-supercritical thermal power plant, it operates with higher efficiency and lower CO\u2082 emissions compared to conventional coal-fired plants, supporting India\u2019s cleaner energy goals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>7. Why is this news important for India?<\/strong><br>It enhances domestic energy security, provides cheaper electricity, fosters regional energy cooperation with Bangladesh, and creates economic opportunities through job creation and infrastructure development.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><br><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Some_Important_Current_Affairs_Links\"><\/span>Some Important Current Affairs Links<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/national\/\" target=\"_blank\" rel=\"noreferrer noopener\">State Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/sports\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sports Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--3\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/international\/\" target=\"_blank\" rel=\"noreferrer noopener\">International Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/banking\/\" target=\"_blank\" rel=\"noreferrer noopener\">Banking Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/railway\/\" target=\"_blank\" rel=\"noreferrer noopener\">Railways Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/defence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Defence Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--4\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs?newsmaticargs=custom&amp;posts=today\" target=\"_blank\" rel=\"noreferrer noopener\">Daily Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--5\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairsinhindi\/\" target=\"_blank\" rel=\"noreferrer noopener\">Current Affairs In Hindi<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--6\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/news-and-notifications\/\" target=\"_blank\" rel=\"noreferrer noopener\">News and Notifications<\/a><\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=com.edunovations.quiz\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg\" alt=\"Download this App for Daily Current Affairs MCQ&#039;s\" class=\"wp-image-247\" title=\"\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-300x50.jpg 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-768x128.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">Download this App for Daily Current Affairs MCQ&#8217;s<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\" id=\"News-Website-Development-Company\"><a href=\"https:\/\/www.martindiainfotech.com\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png\" alt=\"News Website Development Company\" class=\"wp-image-438\" title=\"News Website Development Company\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-300x50.png 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-768x128.png 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">News Website Development Company<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Adani Godda Power Plant approved for Indian grid connection, enhancing domestic energy security, dual supply to Bangladesh, and supporting India\u2019s sustainable power goals. Adani&#8217;s Godda Power Plant Approved for Indian Grid Connection Overview of the Approval The Government of India has granted Adani Power Limited (APL) approval to connect its 1,600 MW Godda Ultra Super&#8230;<\/p>\n","protected":false},"author":6,"featured_media":40882,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,153],"tags":[29619,29622,3328,29620,29621,29623,29625,29624],"class_list":["post-40853","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national","category-miscellaneous","tag-adani-power","tag-electricity-grid","tag-energy-security","tag-godda-plant","tag-india-bangladesh-energy","tag-jharkhand-power-plant","tag-lilo-transmission","tag-thermal-power"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/40853","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/comments?post=40853"}],"version-history":[{"count":3,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/40853\/revisions"}],"predecessor-version":[{"id":40883,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/40853\/revisions\/40883"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media\/40882"}],"wp:attachment":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media?parent=40853"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/categories?post=40853"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/tags?post=40853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}