{"id":3834,"date":"2023-05-09T13:58:59","date_gmt":"2023-05-09T08:28:59","guid":{"rendered":"https:\/\/edunovations.com\/currentaffairs\/?p=3834"},"modified":"2023-05-15T11:16:07","modified_gmt":"2023-05-15T05:46:07","slug":"mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line","status":"publish","type":"post","link":"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/","title":{"rendered":"Mumbai-Ahmedabad High-Speed Rail Corridor: India&#8217;s First High-Speed Rail Line"},"content":{"rendered":"\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Mumbai-Ahmedabad_High-Speed_Rail_Corridor_MAHSR\" >Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Why_This_News_is_Important\" >Why This News is Important<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Historical_Context\" >Historical Context<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#5_Key_Takeaways_from_%E2%80%9CMumbai-Ahmedabad_High-Speed_Rail_Corridor_MAHSR%E2%80%9D\" >5 Key Takeaways from &#8220;Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR)&#8221;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Important_FAQs_for_Students_from_this_News\" >Important FAQs for Students from this News<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Q1_What_is_the_Mumbai-Ahmedabad_High-Speed_Rail_Corridor_project\" >Q1. What is the Mumbai-Ahmedabad High-Speed Rail Corridor project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Q2_What_is_the_estimated_cost_of_the_MAHSR_project\" >Q2. What is the estimated cost of the MAHSR project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Q3_What_is_the_expected_speed_of_the_MAHSR_trains\" >Q3. What is the expected speed of the MAHSR trains?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Q4_What_are_some_benefits_of_the_MAHSR_project\" >Q4. What are some benefits of the MAHSR project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Q5_When_is_the_expected_completion_date_for_the_MAHSR_project\" >Q5. When is the expected completion date for the MAHSR project?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/mumbai-ahmedabad-high-speed-rail-corridor-indias-first-high-speed-rail-line\/#Some_Important_Current_Affairs_Links\" >Some Important Current Affairs Links<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Mumbai-Ahmedabad_High-Speed_Rail_Corridor_MAHSR\"><\/span>Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR)<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR) is a 508-kilometre-long high-speed rail line project that will connect the cities of Mumbai and Ahmedabad in India. This project is being implemented with the help of the Government of Japan, and is expected to be completed by the year 2030.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The MAHSR project is a part of India&#8217;s plan to develop high-speed rail infrastructure in the country, which aims to reduce travel time and improve connectivity between major cities. Once completed, the MAHSR will be India&#8217;s first high-speed rail line, with a maximum speed of 320 km\/hour.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project is expected to provide numerous benefits to the people and economy of the region. It is expected to create thousands of jobs during the construction phase and provide a boost to the local economies of the regions through which the rail line passes. It is also expected to help reduce congestion on the Mumbai-Ahmedabad highway and reduce the environmental impact of transportation by promoting the use of high-speed rail.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The estimated cost of the MAHSR project is around Rs. 1.08 trillion, with the Government of Japan providing a loan of Rs. 880 billion for the project. The remaining amount will be funded by the Government of India.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\" id=\"Mumbai-Ahmedabad-High-Speed-Rail-Corridor\"><img decoding=\"async\" width=\"1024\" height=\"996\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/05\/Mumbai-Ahmedabad-High-Speed-Rail-Corridor-1024x996.jpg\" alt=\"Mumbai-Ahmedabad High-Speed Rail Corridor\" class=\"wp-image-4019\" title=\"Mumbai-Ahmedabad High-Speed Rail Corridor\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/05\/Mumbai-Ahmedabad-High-Speed-Rail-Corridor-1024x996.jpg 1024w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/05\/Mumbai-Ahmedabad-High-Speed-Rail-Corridor-300x292.jpg 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/05\/Mumbai-Ahmedabad-High-Speed-Rail-Corridor-768x747.jpg 768w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/05\/Mumbai-Ahmedabad-High-Speed-Rail-Corridor.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Mumbai-Ahmedabad High-Speed Rail Corridor<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_This_News_is_Important\"><\/span><strong>Why This News is Important<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The MAHSR project is a significant development in India&#8217;s efforts to improve its transportation infrastructure and connectivity between major cities. It will be India&#8217;s first high-speed rail line, and is expected to bring numerous benefits to the people and economy of the region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project will create employment opportunities during the construction phase and boost local economies along the rail line. It will also provide a fast and efficient mode of transportation between Mumbai and Ahmedabad, reducing travel time and congestion on the Mumbai-Ahmedabad highway.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Additionally, the MAHSR project is expected to have a positive impact on the environment by promoting the use of high-speed rail and reducing the carbon footprint of transportation in the region.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Historical_Context\"><\/span><strong>Historical Context<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">India has been working towards developing high-speed rail infrastructure for over a decade. In 2009, the Indian Railways launched a feasibility study for a high-speed rail project between Mumbai and Ahmedabad. The study was completed in 2013, and recommended the construction of a high-speed rail line between the two cities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In 2015, the Government of India signed a Memorandum of Understanding (MoU) with the Government of Japan to collaborate on the development of high-speed rail in India. Under the MoU, Japan agreed to provide technical and financial assistance for the Mumbai-Ahmedabad high-speed rail project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In September 2017, the foundation stone for the MAHSR project was laid by the Prime Ministers of India and Japan. The project is being implemented by the National High Speed Rail Corporation Limited (NHSRCL), a special purpose vehicle set up for the project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_Key_Takeaways_from_%E2%80%9CMumbai-Ahmedabad_High-Speed_Rail_Corridor_MAHSR%E2%80%9D\"><\/span><strong>5 Key Takeaways from &#8220;Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR)&#8221;<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Serial Number<\/th><th>Key Takeaway<\/th><\/tr><\/thead><tbody><tr><td>1.<\/td><td>The MAHSR project is India&#8217;s first high-speed rail line.<\/td><\/tr><tr><td>2.<\/td><td>The estimated cost of the MAHSR project is around Rs. 1.08 trillion, with the Government of Japan providing a loan of Rs. 880 billion for the project.<\/td><\/tr><tr><td>3.<\/td><td>The MAHSR trains are expected to have a maximum speed of 320 km\/hour.<\/td><\/tr><tr><td>4.<\/td><td>The MAHSR project is expected to create employment opportunities during the construction phase and boost local economies along the rail line.<\/td><\/tr><tr><td>5.<\/td><td>The MAHSR project is expected to significantly improve transportation infrastructure in the region, reduce travel time and congestion on the Mumbai-Ahmedabad highway.<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Mumbai-Ahmedabad High-Speed Rail Corridor<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Important_FAQs_for_Students_from_this_News\"><\/span>Important FAQs for Students from this News<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Q1_What_is_the_Mumbai-Ahmedabad_High-Speed_Rail_Corridor_project\"><\/span>Q1. What is the Mumbai-Ahmedabad High-Speed Rail Corridor project?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"> A1. The Mumbai-Ahmedabad High-Speed Rail Corridor project is a high-speed rail line that will connect Mumbai and Ahmedabad. It is India&#8217;s first high-speed rail line and is expected to significantly improve transportation infrastructure in the region.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Q2_What_is_the_estimated_cost_of_the_MAHSR_project\"><\/span>Q2. What is the estimated cost of the MAHSR project?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"> A2. The estimated cost of the MAHSR project is around Rs. 1.08 trillion, with the Government of Japan providing a loan of Rs. 880 billion for the project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Q3_What_is_the_expected_speed_of_the_MAHSR_trains\"><\/span>Q3. What is the expected speed of the MAHSR trains? <span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A3. The MAHSR trains are expected to have a maximum speed of 320 km\/hour.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Q4_What_are_some_benefits_of_the_MAHSR_project\"><\/span>Q4. What are some benefits of the MAHSR project? <span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A4. The MAHSR project is expected to create employment opportunities during the construction phase, reduce travel time and congestion on the Mumbai-Ahmedabad highway, and boost local economies along the rail line.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Q5_When_is_the_expected_completion_date_for_the_MAHSR_project\"><\/span>Q5. When is the expected completion date for the MAHSR project? <span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A5. The MAHSR project is expected to be completed by 2030.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Some_Important_Current_Affairs_Links\"><\/span>Some Important Current Affairs Links<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/national\/\" target=\"_blank\" rel=\"noreferrer noopener\">State Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/sports\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sports Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--3\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/international\/\" target=\"_blank\" rel=\"noreferrer noopener\">International Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/banking\/\" target=\"_blank\" rel=\"noreferrer noopener\">Banking Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/railway\/\" target=\"_blank\" rel=\"noreferrer noopener\">Railways Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/defence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Defence Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--4\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs?newsmaticargs=custom&amp;posts=today\" target=\"_blank\" rel=\"noreferrer noopener\">Daily Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--5\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairsinhindi\/\" target=\"_blank\" rel=\"noreferrer noopener\">Current Affairs In Hindi<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--6\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/news-and-notifications\/\" target=\"_blank\" rel=\"noreferrer noopener\">News and Notifications<\/a><\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=com.edunovations.quiz\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg\" alt=\"Download this App for Daily Current Affairs MCQ&#039;s\" class=\"wp-image-247\" title=\"\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-300x50.jpg 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-768x128.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">Download this App for Daily Current Affairs MCQ&#8217;s<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\" id=\"News-Website-Development-Company\"><a href=\"https:\/\/www.martindiainfotech.com\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png\" alt=\"News Website Development Company\" class=\"wp-image-438\" title=\"News Website Development Company\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-300x50.png 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-768x128.png 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">News Website Development Company<\/figcaption><\/figure>\n\n\n\n<script async=\"\" src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-6643489308705072\" crossorigin=\"anonymous\"><\/script>\n<ins class=\"adsbygoogle\" style=\"display:block\" data-ad-format=\"autorelaxed\" data-ad-client=\"ca-pub-6643489308705072\" data-ad-slot=\"2759669284\"><\/ins>\n<script>\n     (adsbygoogle = window.adsbygoogle || []).push({});\n<\/script>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR) The Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR) is a 508-kilometre-long high-speed rail line project that will connect the cities of Mumbai and Ahmedabad in India. This project is being implemented with the help of the Government of Japan, and is expected to be completed by the year 2030. The MAHSR project&#8230;<\/p>\n","protected":false},"author":5,"featured_media":4022,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,156],"tags":[225,2739,2741,2489,1354],"class_list":["post-3834","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national","category-railway","tag-current-affairs","tag-high-speed-rail","tag-mahsr-project","tag-news","tag-transportation-infrastructure"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/3834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/comments?post=3834"}],"version-history":[{"count":0,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/3834\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media\/4022"}],"wp:attachment":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media?parent=3834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/categories?post=3834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/tags?post=3834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}