{"id":37251,"date":"2025-08-17T18:25:46","date_gmt":"2025-08-17T12:55:46","guid":{"rendered":"https:\/\/edunovations.com\/currentaffairs\/?p=37251"},"modified":"2025-08-17T18:25:48","modified_gmt":"2025-08-17T12:55:48","slug":"100-gw-solar-pv-module-manufacturing","status":"publish","type":"post","link":"https:\/\/edunovations.com\/currentaffairs\/national\/100-gw-solar-pv-module-manufacturing\/","title":{"rendered":"100 GW Solar PV Module Manufacturing India ALMM Milestone | Renewable Energy News"},"content":{"rendered":"\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_82_2 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/100-gw-solar-pv-module-manufacturing\/#100_GW_solar_PV_module_manufacturing_milestone_achieved_in_India_under_ALMM_framework_Learn_about_manufacturers_PLI_scheme_and_Indias_renewable_energy_targets\" >100 GW solar PV module manufacturing milestone achieved in India under ALMM framework. Learn about manufacturers, PLI scheme, and India\u2019s renewable energy targets.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/100-gw-solar-pv-module-manufacturing\/#Why_This_News_is_Important\" >Why This News is Important<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/100-gw-solar-pv-module-manufacturing\/#Historical_Context\" >Historical Context<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/100-gw-solar-pv-module-manufacturing\/#FAQs_Frequently_Asked_Questions\" >FAQs: Frequently Asked Questions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/100-gw-solar-pv-module-manufacturing\/#Some_Important_Current_Affairs_Links\" >Some Important Current Affairs Links<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"100_GW_solar_PV_module_manufacturing_milestone_achieved_in_India_under_ALMM_framework_Learn_about_manufacturers_PLI_scheme_and_Indias_renewable_energy_targets\"><\/span>100 GW solar PV module manufacturing milestone achieved in India under ALMM framework. Learn about manufacturers, PLI scheme, and India\u2019s renewable energy targets.<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>India Achieves 100 GW Solar PV Module Manufacturing Capacity Under ALMM<\/strong><\/p>\n\n\n\n<p>India has reached a significant milestone in its renewable energy journey by achieving 100 gigawatts (GW) of solar photovoltaic (PV) module manufacturing capacity under the Approved List of Models and Manufacturers (ALMM). This achievement marks a substantial increase from just 2.3 GW in 2014, underscoring the country&#8217;s progress in building a comprehensive solar manufacturing ecosystem. <a href=\"https:\/\/swarajyamag.com\/news-brief\/india-reaches-historic-100-gw-solar-module-capacity-under-almm-framework?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noreferrer noopener\">PublicNow+14Swarajya+14StartupPedia+14<\/a><a href=\"https:\/\/etedge-insights.com\/industry\/energy\/india-hits-100-gw-solar-targets-500-gw-non-fossil-by-2030\/?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noreferrer noopener\">Yahoo Finance+7ET Edge Insights+7CDN BBSR+7<\/a><\/p>\n\n\n\n<p><strong>Government Initiatives Fuel Growth<\/strong><\/p>\n\n\n\n<p>The surge in solar PV manufacturing capacity is attributed to transformative initiatives such as the Production Linked Incentive (PLI) Scheme for High-Efficiency Solar Modules. These measures have been instrumental in fostering a self-reliant solar manufacturing ecosystem, aligning with the national vision of Atmanirbhar Bharat and the global imperative for clean energy transition.<\/p>\n\n\n\n<p><strong>Expansion of Manufacturers and Units<\/strong><\/p>\n\n\n\n<p>The ALMM List-I now comprises 100 manufacturers operating 123 manufacturing units, up from 21 producers in 2021. This expansion reflects the growing participation of both established companies and new entrants with high-efficiency, vertically integrated technologies.<\/p>\n\n\n\n<p><strong>Policy Support and Future Plans<\/strong><\/p>\n\n\n\n<p>The government&#8217;s commitment to making India self-reliant in solar PV manufacturing is further demonstrated by plans to bring solar cells under the ALMM framework starting June 1, 2026. These efforts aim to strengthen India&#8217;s position in the global solar value chain and contribute to achieving the target of 500 GW of non-fossil fuel capacity by 2030. <\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\" id=\"100-GW-Solar-PV-Module-Manufacturing\"><img decoding=\"async\" src=\"https:\/\/bsmedia.business-standard.com\/_media\/bs\/img\/article\/2025-04\/20\/full\/1745171767-117.jpg\" alt=\"100 GW Solar PV Module Manufacturing\" title=\"100 GW Solar PV Module Manufacturing\"\/><figcaption class=\"wp-element-caption\">100 GW Solar PV Module Manufacturing<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_This_News_is_Important\"><\/span><strong>Why This News is Important<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Strategic Importance for Government Exams<\/strong><\/p>\n\n\n\n<p>For students preparing for government exams, especially in sectors like energy, environment, and policy-making, understanding this development is crucial. The achievement of 100 GW solar PV module manufacturing capacity under ALMM reflects India&#8217;s commitment to renewable energy and self-reliance, aligning with national policies and international climate goals.<\/p>\n\n\n\n<p><strong>Relevance to Current Affairs<\/strong><\/p>\n\n\n\n<p>This milestone is a significant current affair that showcases the government&#8217;s efforts in promoting clean energy and reducing dependency on imports. Such developments are frequently covered in government exams, making it essential for aspirants to stay informed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Historical_Context\"><\/span><strong>Historical Context<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Early Challenges and Policy Shifts<\/strong><\/p>\n\n\n\n<p>In 2014, India&#8217;s solar PV module manufacturing capacity was a modest 2.3 GW. Recognizing the need for a robust domestic manufacturing base, the government introduced the ALMM in 2019 to ensure quality and compliance in solar projects. The Production Linked Incentive (PLI) Scheme further incentivized manufacturers to enhance capacity and efficiency.<\/p>\n\n\n\n<p><strong>Growth Trajectory<\/strong><\/p>\n\n\n\n<p>From 2021 to 2025, the number of manufacturers increased from 21 to 100, and the manufacturing units expanded from 21 to 123. This rapid growth underscores the effectiveness of policy interventions and the industry&#8217;s response to government initiatives.<\/p>\n\n\n\n<p><strong>Key Takeaways from &#8216;India Achieves 100 GW Solar PV Module Manufacturing Capacity Under ALMM&#8217;<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>No.<\/strong><\/th><th><strong>Key Takeaway<\/strong><\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>India&#8217;s solar PV module manufacturing capacity has surged from 2.3 GW in 2014 to 100 GW in 2025 under ALMM.<\/td><\/tr><tr><td>2<\/td><td>The ALMM List-I now includes 100 manufacturers operating 123 units, up from 21 producers in 2021.<\/td><\/tr><tr><td>3<\/td><td>The Production Linked Incentive (PLI) Scheme for High-Efficiency Solar Modules has been pivotal in this growth.<\/td><\/tr><tr><td>4<\/td><td>Plans are underway to include solar cells under the ALMM framework starting June 1, 2026.<\/td><\/tr><tr><td>5<\/td><td>This achievement aligns with India&#8217;s target of 500 GW of non-fossil fuel capacity by 2030.<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">100 GW Solar PV Module Manufacturing<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs_Frequently_Asked_Questions\"><\/span><strong>FAQs: Frequently Asked Questions<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>1. What is the ALMM framework in India?<\/strong><br>The Approved List of Models and Manufacturers (ALMM) framework ensures that only verified solar PV modules and manufacturers are eligible for government tenders, promoting quality and reliability in solar projects.<\/p>\n\n\n\n<p><strong>2. What milestone has India achieved in solar PV module manufacturing?<\/strong><br>India has reached a manufacturing capacity of 100 GW for solar PV modules under the ALMM framework.<\/p>\n\n\n\n<p><strong>3. How many manufacturers and units are currently listed under ALMM List-I?<\/strong><br>Currently, 100 manufacturers operate 123 manufacturing units under ALMM List-I, up from 21 producers in 2021.<\/p>\n\n\n\n<p><strong>4. What is the Production Linked Incentive (PLI) Scheme?<\/strong><br>The PLI Scheme incentivizes domestic production of high-efficiency solar modules to encourage self-reliance in the renewable energy sector.<\/p>\n\n\n\n<p><strong>5. When will solar cells be included under the ALMM framework?<\/strong><br>Solar cells are planned to be included under the ALMM framework starting from June 1, 2026.<\/p>\n\n\n\n<p><strong>6. How does this milestone support India\u2019s renewable energy targets?<\/strong><br>This achievement aligns with India\u2019s goal of reaching 500 GW of non-fossil fuel capacity by 2030 and strengthens its position in the global solar value chain.<\/p>\n\n\n\n<p><strong>7. Why is the 100 GW milestone significant for government exams?<\/strong><br>It reflects India\u2019s policy initiatives in renewable energy, self-reliance, and climate goals\u2014topics often covered in current affairs sections of government exams like UPSC, PSCs, banking, railways, and defence exams.<\/p>\n\n\n\n<p><br><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Some_Important_Current_Affairs_Links\"><\/span>Some Important Current Affairs Links<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/national\/\" target=\"_blank\" rel=\"noreferrer noopener\">State Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/sports\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sports Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--3\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/international\/\" target=\"_blank\" rel=\"noreferrer noopener\">International Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/banking\/\" target=\"_blank\" rel=\"noreferrer noopener\">Banking Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/railway\/\" target=\"_blank\" rel=\"noreferrer noopener\">Railways Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/defence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Defence Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--4\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs?newsmaticargs=custom&amp;posts=today\" target=\"_blank\" rel=\"noreferrer noopener\">Daily Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--5\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairsinhindi\/\" target=\"_blank\" rel=\"noreferrer noopener\">Current Affairs In Hindi<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--6\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/news-and-notifications\/\" target=\"_blank\" rel=\"noreferrer noopener\">News and Notifications<\/a><\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=com.edunovations.quiz\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg\" alt=\"Download this App for Daily Current Affairs MCQ&#039;s\" class=\"wp-image-247\" title=\"\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-300x50.jpg 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-768x128.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">Download this App for Daily Current Affairs MCQ&#8217;s<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\" id=\"News-Website-Development-Company\"><a href=\"https:\/\/www.martindiainfotech.com\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png\" alt=\"News Website Development Company\" class=\"wp-image-438\" title=\"News Website Development Company\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-300x50.png 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-768x128.png 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">News Website Development Company<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>100 GW solar PV module manufacturing milestone achieved in India under ALMM framework. Learn about manufacturers, PLI scheme, and India\u2019s renewable energy targets. India Achieves 100 GW Solar PV Module Manufacturing Capacity Under ALMM India has reached a significant milestone in its renewable energy journey by achieving 100 gigawatts (GW) of solar photovoltaic (PV) module&#8230;<\/p>\n","protected":false},"author":6,"featured_media":37285,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,153],"tags":[26596,25436,26599,26595,7348,16747,26597,26598],"class_list":["post-37251","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national","category-miscellaneous","tag-almm","tag-government-current-affairs","tag-india-clean-energy","tag-india-solar-news","tag-pli-scheme","tag-renewable-energy-india","tag-solar-energy-targets","tag-solar-pv-manufacturing"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/37251","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/comments?post=37251"}],"version-history":[{"count":2,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/37251\/revisions"}],"predecessor-version":[{"id":37286,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/37251\/revisions\/37286"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media\/37285"}],"wp:attachment":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media?parent=37251"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/categories?post=37251"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/tags?post=37251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}