{"id":37057,"date":"2025-08-13T20:18:25","date_gmt":"2025-08-13T14:48:25","guid":{"rendered":"https:\/\/edunovations.com\/currentaffairs\/?p=37057"},"modified":"2025-08-13T20:18:27","modified_gmt":"2025-08-13T14:48:27","slug":"pm-e-drive-scheme-extension","status":"publish","type":"post","link":"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/","title":{"rendered":"PM E-DRIVE Scheme Extension 2028: Subsidy Changes and EV Infrastructure Boost in India"},"content":{"rendered":"\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_83 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><ul class='ez-toc-list-level-2' ><li class='ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#PM_E-DRIVE_scheme_extension_accelerates_electric_vehicle_adoption_in_India_with_revised_subsidies_and_%E2%82%B92000_crore_for_EV_charging_infrastructure_Learn_key_updates_till_2028\" >PM E-DRIVE scheme extension accelerates electric vehicle adoption in India with revised subsidies and \u20b92,000 crore for EV charging infrastructure. Learn key updates till 2028.<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#PM_E-Drive_Scheme_Extended_Until_2028_Key_Changes_and_Implications\" >PM E-Drive Scheme Extended Until 2028: Key Changes and Implications<\/a><ul class='ez-toc-list-level-2' ><li class='ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#Introduction\" >Introduction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#Key_Changes_in_the_Extended_Scheme\" >Key Changes in the Extended Scheme<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#1_Subsidy_Adjustments_for_Two-Wheelers_and_Three-Wheelers\" >1. Subsidy Adjustments for Two-Wheelers and Three-Wheelers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#2_Introduction_of_Subsidies_for_Electric_Trucks\" >2. Introduction of Subsidies for Electric Trucks<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#3_Infrastructure_Development\" >3. Infrastructure Development<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#Why_This_News_Is_Important\" >Why This News Is Important<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#1_Promotion_of_Sustainable_Transportation\" >1. Promotion of Sustainable Transportation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#2_Boost_to_the_Electric_Vehicle_Industry\" >2. Boost to the Electric Vehicle Industry<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#3_Economic_Implications\" >3. Economic Implications<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#Historical_Context\" >Historical Context<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#Key_Takeaways_from_PM_E-DRIVE_Scheme_Extension\" >Key Takeaways from PM E-DRIVE Scheme Extension<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#FAQs_Frequently_Asked_Questions_on_PM_E-DRIVE_Scheme_Extension\" >FAQs: Frequently Asked Questions on PM E-DRIVE Scheme Extension<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/pm-e-drive-scheme-extension\/#Some_Important_Current_Affairs_Links\" >Some Important Current Affairs Links<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"PM_E-DRIVE_scheme_extension_accelerates_electric_vehicle_adoption_in_India_with_revised_subsidies_and_%E2%82%B92000_crore_for_EV_charging_infrastructure_Learn_key_updates_till_2028\"><\/span>PM E-DRIVE scheme extension accelerates electric vehicle adoption in India with revised subsidies and \u20b92,000 crore for EV charging infrastructure. Learn key updates till 2028.<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h1 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"PM_E-Drive_Scheme_Extended_Until_2028_Key_Changes_and_Implications\"><\/span>PM E-Drive Scheme Extended Until 2028: Key Changes and Implications<span class=\"ez-toc-section-end\"><\/span><\/h1>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Introduction\"><\/span>Introduction<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Government of India has extended the Prime Minister Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) scheme until March 31, 2028. Originally launched on October 1, 2024, with a budget of \u20b910,900 crore, the scheme aims to accelerate the adoption of electric vehicles (EVs) across the country. This extension reflects the government&#8217;s commitment to sustainable transportation and reducing carbon emissions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Changes_in_the_Extended_Scheme\"><\/span>Key Changes in the Extended Scheme<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Subsidy_Adjustments_for_Two-Wheelers_and_Three-Wheelers\"><\/span>1. <strong>Subsidy Adjustments for Two-Wheelers and Three-Wheelers<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Subsidies for electric two-wheelers (e-2Ws) and three-wheelers (e-3Ws) will continue until March 31, 2026. From April 2025, the subsidy for e-2Ws has been reduced from \u20b95,000 per kWh to \u20b92,500 per kWh, with a cap of \u20b910,000 per vehicle. Similarly, subsidies for e-3Ws have been halved from \u20b95,000 per kWh to \u20b92,500 per kWh. These adjustments aim to encourage market maturity in these segments.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Introduction_of_Subsidies_for_Electric_Trucks\"><\/span>2. <strong>Introduction of Subsidies for Electric Trucks<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>In July 2025, the government introduced subsidies for electric trucks under the PM E-DRIVE scheme. These subsidies are available for electric trucks with a gross vehicle weight between 3.5 and 55 tonnes. The subsidy is \u20b95,000 per kWh or up to 10% of the ex-factory price, whichever is lower. This move aims to promote the adoption of electric trucks in the commercial sector.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Infrastructure_Development\"><\/span>3. <strong>Infrastructure Development<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The scheme allocates \u20b92,000 crore for the development of EV charging infrastructure. This includes the installation of 22,100 fast chargers for four-wheelers, 1,800 chargers for buses, and 48,400 chargers for two- and three-wheelers. These efforts are crucial to address one of the major barriers to EV adoption\u2014charging infrastructure.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\" id=\"PM-E-DRIVE-scheme-extension\"><img decoding=\"async\" src=\"https:\/\/img-cdn.publive.online\/fit-in\/640x430\/filters:format(webp)\/smstreet\/media\/media_files\/2024\/11\/06\/TM640vAgpbziUiNp10MV.jpg\" alt=\"PM E-DRIVE scheme extension\" title=\"PM E-DRIVE scheme extension\"\/><figcaption class=\"wp-element-caption\">PM E-DRIVE scheme extension<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_This_News_Is_Important\"><\/span>Why This News Is Important<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Promotion_of_Sustainable_Transportation\"><\/span>1. <strong>Promotion of Sustainable Transportation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The extension of the PM E-DRIVE scheme underscores the government&#8217;s commitment to promoting sustainable transportation. By incentivizing the adoption of electric vehicles, the scheme aims to reduce dependence on fossil fuels and decrease greenhouse gas emissions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Boost_to_the_Electric_Vehicle_Industry\"><\/span>2. <strong>Boost to the Electric Vehicle Industry<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The introduction of subsidies for electric trucks and the development of charging infrastructure are expected to boost the electric vehicle industry in India. These measures will encourage manufacturers to invest in EV technology and expand their product offerings.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Economic_Implications\"><\/span>3. <strong>Economic Implications<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The extension of the scheme and the allocation of funds for infrastructure development are expected to have positive economic implications. The growth of the electric vehicle industry will create new jobs and stimulate economic activity in related sectors such as manufacturing, research and development, and services.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Historical_Context\"><\/span>Historical Context<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The PM E-DRIVE scheme was launched on October 1, 2024, with a budget of \u20b910,900 crore, to accelerate the adoption of electric vehicles in India. The scheme aimed to provide purchase incentives for various EV categories, including two-wheelers, three-wheelers, buses, trucks, and ambulances. It also focused on developing charging infrastructure and testing facilities to support the growth of the EV ecosystem.<\/p>\n\n\n\n<p>The extension of the scheme until March 2028 reflects the government&#8217;s recognition of the need for continued support to achieve widespread adoption of electric vehicles. The adjustments in subsidies and the introduction of new incentives for electric trucks indicate a strategic shift towards promoting sustainable and commercially viable transportation solutions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Takeaways_from_PM_E-DRIVE_Scheme_Extension\"><\/span>Key Takeaways from PM E-DRIVE Scheme Extension<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>S. No.<\/th><th>Key Takeaway<\/th><\/tr><\/thead><tbody><tr><td>1.<\/td><td>The PM E-DRIVE scheme has been extended until March 31, 2028.<\/td><\/tr><tr><td>2.<\/td><td>Subsidies for electric two- and three-wheelers will end on March 31, 2026.<\/td><\/tr><tr><td>3.<\/td><td>New subsidies have been introduced for electric trucks with a gross vehicle weight between 3.5 and 55 tonnes.<\/td><\/tr><tr><td>4.<\/td><td>The scheme allocates \u20b92,000 crore for the development of EV charging infrastructure.<\/td><\/tr><tr><td>5.<\/td><td>The total budget for the scheme remains at \u20b910,900 crore, with no additional funds allocated.<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">PM E-DRIVE scheme extension<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs_Frequently_Asked_Questions_on_PM_E-DRIVE_Scheme_Extension\"><\/span>FAQs: Frequently Asked Questions on PM E-DRIVE Scheme Extension<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>What is the primary goal of the PM E-DRIVE scheme?<\/strong><br>To accelerate the adoption of electric vehicles, reduce pollution, promote sustainable transportation, and boost India\u2019s EV manufacturing ecosystem.<\/p>\n\n\n\n<p><strong>What is the PM E-DRIVE scheme?<\/strong><br>The PM E-DRIVE (Prime Minister Electric Drive Revolution in Innovative Vehicle Enhancement) scheme is a government initiative launched to promote the adoption of electric vehicles across India by providing purchase subsidies and developing EV infrastructure.<\/p>\n\n\n\n<p><strong>Until when has the PM E-DRIVE scheme been extended?<\/strong><br>The scheme has been extended until March 31, 2028.<\/p>\n\n\n\n<p><strong>What changes have been made to the subsidy for electric two-wheelers under the scheme?<\/strong><br>From April 2025, the subsidy for electric two-wheelers has been reduced by 50%, from \u20b95,000 per kWh to \u20b92,500 per kWh, capped at \u20b910,000 per vehicle.<\/p>\n\n\n\n<p><strong>Are there subsidies available for electric trucks under the PM E-DRIVE scheme?<\/strong><br>Yes, subsidies for electric trucks (3.5 to 55 tonnes) were introduced in July 2025, offering \u20b95,000 per kWh or up to 10% of the vehicle&#8217;s ex-factory price.<\/p>\n\n\n\n<p><strong>What is the budget allocated for charging infrastructure under the PM E-DRIVE scheme?<\/strong><br>\u20b92,000 crore has been allocated to develop EV charging infrastructure, including thousands of fast chargers for different vehicle categories.<\/p>\n\n\n\n<p><strong>Why is the PM E-DRIVE scheme important for students preparing for government exams?<\/strong><br>Understanding this scheme is crucial as it reflects government priorities on sustainable development, economic policies related to electric mobility, and industrial growth, which are commonly tested in current affairs sections.<\/p>\n\n\n\n<p><strong>When will the subsidies for electric two-wheelers and three-wheelers end?<\/strong><br>Subsidies for electric two-wheelers and three-wheelers will continue until March 31, 2026.<\/p>\n\n\n\n<p><strong>What kind of vehicles does the PM E-DRIVE scheme cover?<\/strong><br>It covers electric two-wheelers, three-wheelers, buses, trucks, and ambulances.<\/p>\n\n\n\n<p><strong>How does the scheme support electric vehicle adoption apart from subsidies?<\/strong><br>The scheme supports EV adoption by developing a robust charging infrastructure network and testing facilities.<\/p>\n\n\n\n<p><br><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Some_Important_Current_Affairs_Links\"><\/span>Some Important Current Affairs Links<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/national\/\" target=\"_blank\" rel=\"noreferrer noopener\">State Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/sports\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sports Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--3\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/international\/\" target=\"_blank\" rel=\"noreferrer noopener\">International Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/banking\/\" target=\"_blank\" rel=\"noreferrer noopener\">Banking Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/railway\/\" target=\"_blank\" rel=\"noreferrer noopener\">Railways Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/defence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Defence Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--4\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs?newsmaticargs=custom&amp;posts=today\" target=\"_blank\" rel=\"noreferrer noopener\">Daily Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--5\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairsinhindi\/\" target=\"_blank\" rel=\"noreferrer noopener\">Current Affairs In Hindi<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--6\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/news-and-notifications\/\" target=\"_blank\" rel=\"noreferrer noopener\">News and Notifications<\/a><\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=com.edunovations.quiz\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg\" alt=\"Download this App for Daily Current Affairs MCQ&#039;s\" class=\"wp-image-247\" title=\"\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-300x50.jpg 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-768x128.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">Download this App for Daily Current Affairs MCQ&#8217;s<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\" id=\"News-Website-Development-Company\"><a href=\"https:\/\/www.martindiainfotech.com\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png\" alt=\"News Website Development Company\" class=\"wp-image-438\" title=\"News Website Development Company\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-300x50.png 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-768x128.png 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">News Website Development Company<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>PM E-DRIVE scheme extension accelerates electric vehicle adoption in India with revised subsidies and \u20b92,000 crore for EV charging infrastructure. Learn key updates till 2028. PM E-Drive Scheme Extended Until 2028: Key Changes and Implications Introduction The Government of India has extended the Prime Minister Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) scheme&#8230;<\/p>\n","protected":false},"author":6,"featured_media":37095,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,159],"tags":[26427,362,26426,26425,1126,25036,26424,360],"class_list":["post-37057","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national","category-scheme_and_committees","tag-electric-trucks","tag-electric-vehicles","tag-ev-charging","tag-ev-subsidy","tag-government-scheme","tag-india-ev-policy","tag-pm-e-drive","tag-sustainable-transport"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/37057","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/comments?post=37057"}],"version-history":[{"count":2,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/37057\/revisions"}],"predecessor-version":[{"id":37096,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/37057\/revisions\/37096"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media\/37095"}],"wp:attachment":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media?parent=37057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/categories?post=37057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/tags?post=37057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}