{"id":36904,"date":"2025-08-10T11:23:35","date_gmt":"2025-08-10T05:53:35","guid":{"rendered":"https:\/\/edunovations.com\/currentaffairs\/?p=36904"},"modified":"2025-08-10T11:23:38","modified_gmt":"2025-08-10T05:53:38","slug":"delhi-assembly-solar-power-project","status":"publish","type":"post","link":"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/","title":{"rendered":"Delhi Assembly Solar Power Project: India\u2019s First Legislature on 100% Renewable Energy"},"content":{"rendered":"\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_83 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Delhi_Assembly_solar_power_project_makes_it_Indias_first_legislature_to_run_entirely_on_renewable_energy_saving_%E2%82%B920_lakh_annually_and_launching_the_National_e-Vidhan_Application_for_paperless_governance\" >Delhi Assembly solar power project makes it India\u2019s first legislature to run entirely on renewable energy, saving \u20b920 lakh annually and launching the National e-Vidhan Application for paperless governance.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Delhi_Assembly_Becomes_Indias_First_Legislature_to_Run_Entirely_on_Solar_Power\" >Delhi Assembly Becomes India\u2019s First Legislature to Run Entirely on Solar Power<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Inauguration_of_a_Landmark_Renewable_Energy_Project\" >Inauguration of a Landmark Renewable Energy Project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Integration_with_Digital_Legislative_Operations\" >Integration with Digital Legislative Operations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Cost_and_Energy_Efficiency_Gains\" >Cost and Energy Efficiency Gains<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Symbolic_and_Practical_Impact_on_Governance\" >Symbolic and Practical Impact on Governance<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Why_This_News_is_Important\" >Why This News is Important<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#A_Model_for_Sustainable_Governance\" >A Model for Sustainable Governance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Relevant_for_Multiple_Exam_Topics\" >Relevant for Multiple Exam Topics<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Historical_Context\" >Historical Context<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Key_Takeaways_from_%E2%80%98Delhi_Assembly_Goes_Fully_Solar\" >Key Takeaways from \u2018Delhi Assembly Goes Fully Solar\u2019<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#FAQs_Frequently_Asked_Questions\" >FAQs: Frequently Asked Questions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/delhi\/delhi-assembly-solar-power-project\/#Some_Important_Current_Affairs_Links\" >Some Important Current Affairs Links<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Delhi_Assembly_solar_power_project_makes_it_Indias_first_legislature_to_run_entirely_on_renewable_energy_saving_%E2%82%B920_lakh_annually_and_launching_the_National_e-Vidhan_Application_for_paperless_governance\"><\/span>Delhi Assembly solar power project makes it India\u2019s first legislature to run entirely on renewable energy, saving \u20b920 lakh annually and launching the National e-Vidhan Application for paperless governance.<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Delhi_Assembly_Becomes_Indias_First_Legislature_to_Run_Entirely_on_Solar_Power\"><\/span><strong>Delhi Assembly Becomes India\u2019s First Legislature to Run Entirely on Solar Power<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Inauguration_of_a_Landmark_Renewable_Energy_Project\"><\/span><strong>Inauguration of a Landmark Renewable Energy Project<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The Delhi Legislative Assembly has set a new benchmark in sustainable governance by becoming the <strong>first legislature in India to operate entirely on solar power<\/strong>. This achievement follows the inauguration of a <strong>500 kW rooftop solar plant<\/strong>, designed to meet the entire electricity demand of the Assembly complex. The move aligns with India\u2019s broader renewable energy transition targets and highlights Delhi\u2019s commitment to reducing its carbon footprint.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Integration_with_Digital_Legislative_Operations\"><\/span><strong>Integration with Digital Legislative Operations<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Alongside the solar project, the Assembly also launched the <strong>National e-Vidhan Application (NeVA)<\/strong> platform, marking a shift toward paperless legislative proceedings. This integration ensures that the Delhi Assembly is not only energy self-reliant but also digitally equipped to streamline law-making processes, reduce paper usage, and enhance transparency.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Cost_and_Energy_Efficiency_Gains\"><\/span><strong>Cost and Energy Efficiency Gains<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>With the commissioning of the solar power system, the Assembly is expected to save around <strong>\u20b920 lakh annually<\/strong> in electricity bills. The clean energy generated will replace the dependency on conventional grid electricity, thereby contributing to a significant reduction in greenhouse gas emissions. These savings can be redirected toward other development priorities.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Symbolic_and_Practical_Impact_on_Governance\"><\/span><strong>Symbolic and Practical Impact on Governance<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The Delhi Assembly\u2019s transition to 100% solar energy demonstrates the potential for government institutions to adopt eco-friendly solutions. It serves as an inspiring example for other state legislatures, municipal bodies, and public offices to adopt renewable energy sources and modern digital tools, reinforcing the importance of sustainable governance.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\" id=\"Delhi-Assembly-solar-power-project\"><img decoding=\"async\" src=\"https:\/\/thecsrjournal.in\/wp-content\/uploads\/2025\/05\/Solar_1_optimized_100.webp\" alt=\"Delhi Assembly solar power project\" title=\"Delhi Assembly solar power project\"\/><figcaption class=\"wp-element-caption\">Delhi Assembly solar power project<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_This_News_is_Important\"><\/span><strong>Why This News is Important<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"A_Model_for_Sustainable_Governance\"><\/span><strong>A Model for Sustainable Governance<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>For aspirants of government jobs \u2014 especially those in <strong>civil services, railways, defence, police, and administrative roles<\/strong> \u2014 this news illustrates the increasing emphasis on environmental sustainability in public policy. Understanding such initiatives is vital for questions on governance, sustainable development goals (SDGs), and renewable energy policies.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Relevant_for_Multiple_Exam_Topics\"><\/span><strong>Relevant for Multiple Exam Topics<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>This event links to <strong>Indian Polity<\/strong>, <strong>Environment and Ecology<\/strong>, and <strong>Government Schemes<\/strong> \u2014 all common topics in competitive exams like UPSC, SSC, and State PSCs. It also reflects India\u2019s progress toward its <strong>National Solar Mission targets<\/strong>, making it an important case study for essay writing and interview discussions.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Historical_Context\"><\/span><strong>Historical Context<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Delhi Legislative Assembly building, inaugurated in 2000, has been at the center of legislative operations for the National Capital Territory of Delhi. India\u2019s push for renewable energy gained momentum in 2010 with the launch of the <strong>Jawaharlal Nehru National Solar Mission<\/strong>, aiming to establish India as a global leader in solar energy. Over the years, several public institutions adopted partial solar setups, but Delhi Assembly\u2019s move to fully solar operations marks a historic first. The simultaneous adoption of the <strong>NeVA platform<\/strong> ties into the <strong>Digital India initiative<\/strong>, launched in 2015, which aims for paperless, transparent, and citizen-friendly governance.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Takeaways_from_%E2%80%98Delhi_Assembly_Goes_Fully_Solar\"><\/span><strong>Key Takeaways from \u2018Delhi Assembly Goes Fully Solar\u2019<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>S.No<\/th><th>Key Takeaway<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>Delhi Legislative Assembly is the first in India to run entirely on solar power.<\/td><\/tr><tr><td>2<\/td><td>A 500 kW rooftop solar plant now meets 100% of the Assembly\u2019s electricity needs.<\/td><\/tr><tr><td>3<\/td><td>The National e-Vidhan Application (NeVA) platform was launched alongside the solar project.<\/td><\/tr><tr><td>4<\/td><td>The initiative will save around \u20b920 lakh annually in electricity costs.<\/td><\/tr><tr><td>5<\/td><td>This project supports India\u2019s renewable energy goals and promotes paperless governance.<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Delhi Assembly solar power project<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs_Frequently_Asked_Questions\"><\/span><strong>FAQs: Frequently Asked Questions<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Q1. Which Indian legislature has become the first to operate entirely on solar power?<\/strong><br>The Delhi Legislative Assembly is the first legislature in India to run entirely on solar energy.<\/p>\n\n\n\n<p><strong>Q2. What is the capacity of the solar power plant installed at the Delhi Assembly?<\/strong><br>The rooftop solar plant has a capacity of <strong>500 kW<\/strong>.<\/p>\n\n\n\n<p><strong>Q3. What is the estimated annual savings in electricity costs after adopting solar energy?<\/strong><br>The Delhi Assembly is expected to save around <strong>\u20b920 lakh annually<\/strong>.<\/p>\n\n\n\n<p><strong>Q4. Which digital platform was launched alongside the solar power initiative in Delhi Assembly?<\/strong><br>The <strong>National e-Vidhan Application (NeVA)<\/strong> platform was launched.<\/p>\n\n\n\n<p><strong>Q5. How does the Delhi Assembly\u2019s solar transition contribute to India\u2019s environmental goals?<\/strong><br>It supports <strong>India\u2019s renewable energy targets<\/strong>, reduces greenhouse gas emissions, and promotes sustainable governance.<\/p>\n\n\n\n<p><strong>Q6. When was the Delhi Legislative Assembly building inaugurated?<\/strong><br>The Assembly building was inaugurated in <strong>2000<\/strong>.<\/p>\n\n\n\n<p><strong>Q7. Which national mission supports large-scale adoption of solar energy in India?<\/strong><br>The <strong>Jawaharlal Nehru National Solar Mission<\/strong>.<\/p>\n\n\n\n<p><strong>Q8. How does the NeVA platform help in governance?<\/strong><br>It enables <strong>paperless proceedings<\/strong>, increases transparency, and improves legislative efficiency.<\/p>\n\n\n\n<p><strong>Q9. Under which national initiative does NeVA align?<\/strong><br>It aligns with the <strong>Digital India initiative<\/strong>.<\/p>\n\n\n\n<p><strong>Q10. Why is this news important for government exam aspirants?<\/strong><br>It is relevant for <strong>Indian Polity, Environment &amp; Ecology, Governance, and Government Schemes<\/strong> sections of competitive exams.<\/p>\n\n\n\n<p><br><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Some_Important_Current_Affairs_Links\"><\/span>Some Important Current Affairs Links<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/national\/\" target=\"_blank\" rel=\"noreferrer noopener\">State Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/sports\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sports Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--3\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/international\/\" target=\"_blank\" rel=\"noreferrer noopener\">International Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/banking\/\" target=\"_blank\" rel=\"noreferrer noopener\">Banking Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/railway\/\" target=\"_blank\" rel=\"noreferrer noopener\">Railways Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/defence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Defence Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--4\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs?newsmaticargs=custom&amp;posts=today\" target=\"_blank\" rel=\"noreferrer noopener\">Daily Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--5\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairsinhindi\/\" target=\"_blank\" rel=\"noreferrer noopener\">Current Affairs In Hindi<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--6\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/news-and-notifications\/\" target=\"_blank\" rel=\"noreferrer noopener\">News and Notifications<\/a><\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=com.edunovations.quiz\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg\" alt=\"Download this App for Daily Current Affairs MCQ&#039;s\" class=\"wp-image-247\" title=\"\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-300x50.jpg 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-768x128.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">Download this App for Daily Current Affairs MCQ&#8217;s<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\" id=\"News-Website-Development-Company\"><a href=\"https:\/\/www.martindiainfotech.com\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png\" alt=\"News Website Development Company\" class=\"wp-image-438\" title=\"News Website Development Company\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-300x50.png 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-768x128.png 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">News Website Development Company<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Delhi Assembly solar power project makes it India\u2019s first legislature to run entirely on renewable energy, saving \u20b920 lakh annually and launching the National e-Vidhan Application for paperless governance. Delhi Assembly Becomes India\u2019s First Legislature to Run Entirely on Solar Power Inauguration of a Landmark Renewable Energy Project The Delhi Legislative Assembly has set a&#8230;<\/p>\n","protected":false},"author":6,"featured_media":36934,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[81,87],"tags":[26251,1016,24991,25436,17481,2996,227,5311,12815],"class_list":["post-36904","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-delhi","category-awards_medals","tag-delhi-assembly","tag-digital-india","tag-environment-and-ecology","tag-government-current-affairs","tag-indian-polity","tag-neva","tag-renewable-energy","tag-solar-energy","tag-sustainable-governance"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/36904","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/comments?post=36904"}],"version-history":[{"count":2,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/36904\/revisions"}],"predecessor-version":[{"id":36933,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/36904\/revisions\/36933"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media\/36934"}],"wp:attachment":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media?parent=36904"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/categories?post=36904"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/tags?post=36904"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}