{"id":31327,"date":"2025-03-11T12:55:49","date_gmt":"2025-03-11T07:25:49","guid":{"rendered":"https:\/\/edunovations.com\/currentaffairs\/?p=31327"},"modified":"2025-03-13T14:36:36","modified_gmt":"2025-03-13T09:06:36","slug":"india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy","status":"publish","type":"post","link":"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/","title":{"rendered":"India Achieves 100 GW Solar Power Capacity \u2013 A Major Milestone in Renewable Energy"},"content":{"rendered":"\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_83 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Introduction\" >Introduction<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Indias_Solar_Power_Growth_A_Landmark_Achievement\" >India\u2019s Solar Power Growth: A Landmark Achievement<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Government_Initiatives_Boosting_Solar_Energy\" >Government Initiatives Boosting Solar Energy<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Challenges_in_Indias_Solar_Power_Expansion\" >Challenges in India&#8217;s Solar Power Expansion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Impact_of_100_GW_Solar_Capacity_on_Indias_Energy_Sector\" >Impact of 100 GW Solar Capacity on India&#8217;s Energy Sector<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Why_This_News_is_Important\" >Why This News is Important?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#1_Indias_Commitment_to_Renewable_Energy\" >1. India&#8217;s Commitment to Renewable Energy<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#2_Impact_on_Government_Exam_Aspirants\" >2. Impact on Government Exam Aspirants<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#3_Contribution_to_Sustainable_Development_Goals_SDGs\" >3. Contribution to Sustainable Development Goals (SDGs)<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Historical_Context_Indias_Solar_Power_Journey\" >Historical Context: India&#8217;s Solar Power Journey<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Key_Takeaways_from_%E2%80%9CIndia_Achieves_100_GW_Solar_Power_Capacity%E2%80%9D\" >Key Takeaways from &#8220;India Achieves 100 GW Solar Power Capacity&#8221;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Important_FAQs_for_Students_from_this_News\" >Important FAQs for Students from this News<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#1_What_is_Indias_current_installed_solar_power_capacity\" >1. What is India&#8217;s current installed solar power capacity?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#2_What_is_Indias_renewable_energy_target_for_2030\" >2. What is India&#8217;s renewable energy target for 2030?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#3_Which_government_schemes_have_contributed_to_Indias_solar_energy_growth\" >3. Which government schemes have contributed to India&#8217;s solar energy growth?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#4_What_are_the_major_challenges_in_Indias_solar_power_sector\" >4. What are the major challenges in India&#8217;s solar power sector?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#5_What_is_the_International_Solar_Alliance_ISA\" >5. What is the International Solar Alliance (ISA)?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/edunovations.com\/currentaffairs\/national\/india-achieves-100-gw-solar-power-capacity-a-major-milestone-in-renewable-energy\/#Some_Important_Current_Affairs_Links\" >Some Important Current Affairs Links<\/a><\/li><\/ul><\/nav><\/div>\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Introduction\"><\/span><strong>Introduction<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p>India has reached a significant milestone in its renewable energy journey by achieving 100 GW (gigawatts) of installed solar power capacity. This achievement underscores the country&#8217;s commitment to clean energy and sustainability. The expansion of solar power contributes to India&#8217;s ambitious renewable energy targets and its commitment to reducing carbon emissions under international climate agreements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Indias_Solar_Power_Growth_A_Landmark_Achievement\"><\/span><strong>India\u2019s Solar Power Growth: A Landmark Achievement<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>India&#8217;s solar energy sector has witnessed rapid growth over the past decade. From just a few megawatts in 2010, the country has now surpassed 100 GW of installed capacity. This milestone is a crucial step toward achieving India&#8217;s target of 500 GW of renewable energy capacity by 2030.<\/p>\n\n\n\n<p>The government has implemented various policies and initiatives, such as the <strong>Jawaharlal Nehru National Solar Mission (JNNSM)<\/strong>, which aimed to establish India as a global leader in solar energy. The introduction of incentives like Production-Linked Incentive (PLI) schemes and subsidies for solar panel manufacturing has further boosted the sector.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Government_Initiatives_Boosting_Solar_Energy\"><\/span><strong>Government Initiatives Boosting Solar Energy<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Several initiatives have played a crucial role in India&#8217;s solar power expansion:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Solar Park Scheme<\/strong>: The government has established solar parks across multiple states, encouraging large-scale solar power generation.<\/li>\n\n\n\n<li><strong>Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM) Scheme<\/strong>: This scheme promotes solar energy use among farmers by providing financial support for solar-powered irrigation pumps.<\/li>\n\n\n\n<li><strong>Rooftop Solar Program<\/strong>: Aimed at increasing decentralized solar power production through residential and commercial rooftop installations.<\/li>\n\n\n\n<li><strong>International Solar Alliance (ISA)<\/strong>: India, in collaboration with France, launched the ISA to foster solar energy adoption globally, particularly in tropical countries.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Challenges_in_Indias_Solar_Power_Expansion\"><\/span><strong>Challenges in India&#8217;s Solar Power Expansion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Despite remarkable progress, several challenges remain in India&#8217;s solar energy sector:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Land Acquisition Issues<\/strong>: Large-scale solar projects require vast land areas, often leading to disputes.<\/li>\n\n\n\n<li><strong>Energy Storage Limitations<\/strong>: Efficient battery storage systems are needed to ensure uninterrupted power supply.<\/li>\n\n\n\n<li><strong>Grid Integration<\/strong>: A robust infrastructure is required to integrate solar energy into the national grid efficiently.<\/li>\n\n\n\n<li><strong>Financial Constraints<\/strong>: High initial investment costs remain a challenge for small and medium-scale solar projects.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Impact_of_100_GW_Solar_Capacity_on_Indias_Energy_Sector\"><\/span><strong>Impact of 100 GW Solar Capacity on India&#8217;s Energy Sector<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The achievement of 100 GW solar capacity has multiple benefits:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Reduced Carbon Footprint<\/strong>: Solar energy significantly cuts down greenhouse gas emissions.<\/li>\n\n\n\n<li><strong>Energy Security<\/strong>: Enhances India&#8217;s energy independence by reducing reliance on fossil fuels.<\/li>\n\n\n\n<li><strong>Job Creation<\/strong>: The solar sector has created thousands of jobs, from manufacturing to installation and maintenance.<\/li>\n\n\n\n<li><strong>Economic Growth<\/strong>: Boosts India&#8217;s economy by attracting foreign investments in the renewable energy sector.<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\" id=\"India-100-GW-solar-power\"><img decoding=\"async\" width=\"259\" height=\"194\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2025\/03\/India-100-GW-solar-power.jpg\" alt=\"India 100 GW solar power\" class=\"wp-image-31328\" style=\"width:575px;height:auto\" title=\"India 100 GW solar power\"\/><figcaption class=\"wp-element-caption\">India 100 GW solar power<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_This_News_is_Important\"><\/span><strong>Why This News is Important?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Indias_Commitment_to_Renewable_Energy\"><\/span><strong>1. India&#8217;s Commitment to Renewable Energy<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>This achievement demonstrates India\u2019s serious commitment to renewable energy and climate goals. With increasing global emphasis on reducing carbon emissions, India&#8217;s progress in solar energy strengthens its position in international climate negotiations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Impact_on_Government_Exam_Aspirants\"><\/span><strong>2. Impact on Government Exam Aspirants<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>For aspirants preparing for government exams like UPSC, SSC, Banking, and Railways, this topic is important for current affairs, environment, and energy-related sections. Questions related to renewable energy targets, policies, and climate change agreements can be expected.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Contribution_to_Sustainable_Development_Goals_SDGs\"><\/span><strong>3. Contribution to Sustainable Development Goals (SDGs)<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The milestone aligns with <strong>SDG 7 (Affordable and Clean Energy)<\/strong> and <strong>SDG 13 (Climate Action)<\/strong>, highlighting India&#8217;s role in global sustainability efforts.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Historical_Context_Indias_Solar_Power_Journey\"><\/span><strong>Historical Context: India&#8217;s Solar Power Journey<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>2010<\/strong>: The <strong>Jawaharlal Nehru National Solar Mission<\/strong> was launched to promote solar energy in India.<\/li>\n\n\n\n<li><strong>2015<\/strong>: The government announced a target of 100 GW solar power capacity by 2022 under the <strong>National Solar Mission<\/strong>.<\/li>\n\n\n\n<li><strong>2017<\/strong>: India\u2019s solar power capacity crossed 20 GW, with rapid project development in states like Rajasthan, Gujarat, and Tamil Nadu.<\/li>\n\n\n\n<li><strong>2018<\/strong>: India became the <strong>fifth-largest<\/strong> solar power producer in the world.<\/li>\n\n\n\n<li><strong>2021<\/strong>: The country achieved 50 GW of installed solar capacity.<\/li>\n\n\n\n<li><strong>2024<\/strong>: India crosses the 100 GW milestone, reaffirming its leadership in renewable energy.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Takeaways_from_%E2%80%9CIndia_Achieves_100_GW_Solar_Power_Capacity%E2%80%9D\"><\/span><strong>Key Takeaways from &#8220;India Achieves 100 GW Solar Power Capacity&#8221;<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>S.No<\/th><th>Key Takeaway<\/th><\/tr><\/thead><tbody><tr><td>1.<\/td><td>India has reached 100 GW of installed solar power capacity, a major milestone in renewable energy.<\/td><\/tr><tr><td>2.<\/td><td>The government has implemented various schemes, including the National Solar Mission and PLI schemes, to promote solar energy.<\/td><\/tr><tr><td>3.<\/td><td>Challenges such as land acquisition, energy storage, and financial constraints remain in the sector.<\/td><\/tr><tr><td>4.<\/td><td>Achieving this milestone strengthens India\u2019s commitment to climate change goals and sustainable development.<\/td><\/tr><tr><td>5.<\/td><td>This news is crucial for government exam aspirants as it relates to renewable energy policies, environmental issues, and economic growth.<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">India 100 GW solar power<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Important_FAQs_for_Students_from_this_News\"><\/span>Important FAQs for Students from this News<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_What_is_Indias_current_installed_solar_power_capacity\"><\/span><strong>1. What is India&#8217;s current installed solar power capacity?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>As of 2024, India has achieved 100 GW of installed solar power capacity.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_What_is_Indias_renewable_energy_target_for_2030\"><\/span><strong>2. What is India&#8217;s renewable energy target for 2030?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>India aims to achieve <strong>500 GW of renewable energy capacity<\/strong> by 2030, with a significant contribution from solar energy.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Which_government_schemes_have_contributed_to_Indias_solar_energy_growth\"><\/span><strong>3. Which government schemes have contributed to India&#8217;s solar energy growth?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Key schemes include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Jawaharlal Nehru National Solar Mission (JNNSM)<\/strong><\/li>\n\n\n\n<li><strong>Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM)<\/strong><\/li>\n\n\n\n<li><strong>Solar Park Scheme<\/strong><\/li>\n\n\n\n<li><strong>Rooftop Solar Program<\/strong><\/li>\n\n\n\n<li><strong>Production-Linked Incentive (PLI) for Solar Manufacturing<\/strong><\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_What_are_the_major_challenges_in_Indias_solar_power_sector\"><\/span><strong>4. What are the major challenges in India&#8217;s solar power sector?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Challenges include <strong>land acquisition issues, energy storage limitations, grid integration, and high financial investment<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_What_is_the_International_Solar_Alliance_ISA\"><\/span><strong>5. What is the International Solar Alliance (ISA)?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The <strong>ISA is an initiative launched by India and France<\/strong> to promote solar energy adoption worldwide, especially in tropical countries.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Some_Important_Current_Affairs_Links\"><\/span>Some Important Current Affairs Links<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/national\/\" target=\"_blank\" rel=\"noreferrer noopener\">State Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/sports\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sports Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--3\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/international\/\" target=\"_blank\" rel=\"noreferrer noopener\">International Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/banking\/\" target=\"_blank\" rel=\"noreferrer noopener\">Banking Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/railway\/\" target=\"_blank\" rel=\"noreferrer noopener\">Railways Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/defence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Defence Current Affairs<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--4\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs?newsmaticargs=custom&amp;posts=today\" target=\"_blank\" rel=\"noreferrer noopener\">Daily Current Affairs<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--5\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairsinhindi\/\" target=\"_blank\" rel=\"noreferrer noopener\">Current Affairs In Hindi<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-outline is-style-outline--6\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/news-and-notifications\/\" target=\"_blank\" rel=\"noreferrer noopener\">News and Notifications<\/a><\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=com.edunovations.quiz\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg\" alt=\"Download this App for Daily Current Affairs MCQ&#039;s\" class=\"wp-image-247\" title=\"\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-300x50.jpg 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-768x128.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">Download this App for Daily Current Affairs MCQ&#8217;s<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\" id=\"News-Website-Development-Company\"><a href=\"https:\/\/www.martindiainfotech.com\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png\" alt=\"News Website Development Company\" class=\"wp-image-438\" title=\"News Website Development Company\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-300x50.png 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-768x128.png 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">News Website Development Company<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction India has reached a significant milestone in its renewable energy journey by achieving 100 GW (gigawatts) of installed solar power capacity. This achievement underscores the country&#8217;s commitment to clean energy and sustainability. The expansion of solar power contributes to India&#8217;s ambitious renewable energy targets and its commitment to reducing carbon emissions under international climate&#8230;<\/p>\n","protected":false},"author":6,"featured_media":31329,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,160],"tags":[20982,11374,20981,20980],"class_list":["post-31327","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national","category-science_and_technology","tag-india-100-gw-solar-target","tag-india-solar-power","tag-renewable-energy-milestones","tag-solar-power-in-india"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/31327","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/comments?post=31327"}],"version-history":[{"count":0,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/posts\/31327\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media\/31329"}],"wp:attachment":[{"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/media?parent=31327"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/categories?post=31327"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/edunovations.com\/currentaffairs\/wp-json\/wp\/v2\/tags?post=31327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}