{"id":21902,"date":"2026-07-01T16:38:54","date_gmt":"2026-07-01T11:08:54","guid":{"rendered":"https:\/\/edunovations.com\/courses2\/rajasthan-haryana-yamuna-water-project-agreement-2026-key-features-benefits-significance-uyrb-agreement-and-exam-notes\/"},"modified":"2026-07-01T16:38:54","modified_gmt":"2026-07-01T11:08:54","slug":"rajasthan-haryana-yamuna-water-project-agreement-2026-key-features-benefits-significance-uyrb-agreement-and-exam-notes","status":"publish","type":"post","link":"https:\/\/edunovations.com\/courses2\/rajasthan-haryana-yamuna-water-project-agreement-2026-key-features-benefits-significance-uyrb-agreement-and-exam-notes\/","title":{"rendered":"Rajasthan Haryana Yamuna Water Project Agreement 2026: Key Features, Benefits, Significance, UYRB Agreement and Exam Notes"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Rajasthan Haryana Yamuna Water Project Agreement 2026 explained with key features, \u20b934,102 crore project details, 580 MCM Yamuna water allocation, Upper Yamuna River Board Agreement, benefits, significance, historical background, MCQs, FAQs, and exam notes for UPSC, SSC, Banking, Railways, Defence, and State PSC aspirants.<\/h2>\n<h2 class=\"wp-block-heading\">Rajasthan and Haryana Sign Historic Yamuna Water Project Agreement<\/h2>\n<p class=\"wp-block-paragraph\">In a landmark development for inter-state water cooperation, the governments of Rajasthan and Haryana have signed a historic agreement to implement the long-pending Yamuna Water Project. The agreement marks the operationalization of the 1994 Upper Yamuna River Board (UYRB) Agreement after nearly three decades of delay and is expected to significantly improve drinking water availability and groundwater recharge in water-scarce regions of both states.<\/p>\n<p class=\"wp-block-paragraph\">The Memorandum of Agreement (MoA) was signed in New Delhi in the presence of Union Home Minister Amit Shah, Union Jal Shakti Minister C.R. Patil, Rajasthan Chief Minister Bhajan Lal Sharma, and Haryana Chief Minister Nayab Singh Saini. The project has emerged as one of the most important examples of cooperative federalism in India\u2019s water governance.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">A Long-Pending Water Project Finally Becomes Reality<\/h2>\n<p class=\"wp-block-paragraph\">The Yamuna Water Project has remained pending for almost 32 years despite the signing of the Upper Yamuna River Board Agreement in 1994. The absence of a dedicated infrastructure for transporting Rajasthan\u2019s allocated share of Yamuna water prevented the implementation of the agreement for decades.<\/p>\n<p class=\"wp-block-paragraph\">The newly signed agreement resolves this issue by facilitating the construction of an underground pipeline network that will carry Rajasthan\u2019s allocated share of Yamuna water from the Hathnikund Barrage through the Western Yamuna Canal system. This marks the end of one of the longest-pending inter-state water-sharing issues in northern India.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">Key Features of the Yamuna Water Project<\/h2>\n<p class=\"wp-block-paragraph\">The Yamuna Water Project is an ambitious water infrastructure initiative with an estimated cost of approximately <strong>\u20b934,102 crore<\/strong>. Under the agreement:<\/p>\n<ul class=\"wp-block-list\">\n<li>Around <strong>580 Million Cubic Metres (MCM)<\/strong> of Yamuna water will be supplied to Rajasthan.<\/li>\n<li>Water will be transferred through <strong>three underground pipelines<\/strong>.<\/li>\n<li>The transfer will primarily take place during the <strong>monsoon months (July to October)<\/strong>.<\/li>\n<li>The project will utilize Rajasthan\u2019s allocated share of water under the 1994 Upper Yamuna Agreement.<\/li>\n<li>Underground pipelines have been selected to reduce evaporation losses and improve water-use efficiency.<\/li>\n<\/ul>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">Regions Expected to Benefit<\/h2>\n<p class=\"wp-block-paragraph\">The agreement is expected to transform drinking water availability in several drought-prone regions.<\/p>\n<p class=\"wp-block-paragraph\">Major beneficiary districts include:<\/p>\n<h3 class=\"wp-block-heading\">Rajasthan<\/h3>\n<ul class=\"wp-block-list\">\n<li>Sikar<\/li>\n<li>Jhunjhunu<\/li>\n<li>Churu<\/li>\n<li>Parts of the Shekhawati region<\/li>\n<\/ul>\n<h3 class=\"wp-block-heading\">Haryana<\/h3>\n<ul class=\"wp-block-list\">\n<li>Bhiwani<\/li>\n<li>Fatehabad<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">The Shekhawati region, which has historically faced acute drinking water shortages and declining groundwater levels, is expected to receive significant relief through this project. Millions of residents are likely to benefit from improved access to safe drinking water.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">Importance of Underground Pipeline Infrastructure<\/h2>\n<p class=\"wp-block-paragraph\">One of the most innovative aspects of the project is the use of underground pipelines instead of conventional open canals.<\/p>\n<p class=\"wp-block-paragraph\">This approach offers several advantages:<\/p>\n<ul class=\"wp-block-list\">\n<li>Minimizes water loss due to evaporation.<\/li>\n<li>Prevents illegal water diversion and leakage.<\/li>\n<li>Ensures faster and more efficient water delivery.<\/li>\n<li>Reduces maintenance costs over the long term.<\/li>\n<li>Supports sustainable management of scarce water resources.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">The use of modern pipeline infrastructure reflects India\u2019s increasing emphasis on efficient water conservation and climate-resilient infrastructure.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">Significance for Cooperative Federalism<\/h2>\n<p class=\"wp-block-paragraph\">Water sharing has historically been a contentious issue among Indian states. The successful agreement between Rajasthan and Haryana demonstrates how dialogue and cooperation can resolve long-standing disputes.<\/p>\n<p class=\"wp-block-paragraph\">The project showcases:<\/p>\n<ul class=\"wp-block-list\">\n<li>Effective Centre-State coordination.<\/li>\n<li>Peaceful resolution of interstate resource-sharing issues.<\/li>\n<li>Strengthening of cooperative federalism.<\/li>\n<li>Improved institutional coordination through the Upper Yamuna River Board.<\/li>\n<li>Better utilization of allocated natural resources.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">The agreement also reflects the growing importance of consensus-based governance in addressing complex water management challenges.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">Environmental and Socio-Economic Benefits<\/h2>\n<p class=\"wp-block-paragraph\">Beyond supplying drinking water, the Yamuna Water Project is expected to generate multiple long-term benefits.<\/p>\n<p class=\"wp-block-paragraph\">These include:<\/p>\n<ul class=\"wp-block-list\">\n<li>Improvement in groundwater recharge through storage structures.<\/li>\n<li>Enhanced water security for rural communities.<\/li>\n<li>Better public health due to access to clean drinking water.<\/li>\n<li>Reduced dependence on over-exploited groundwater sources.<\/li>\n<li>Support for sustainable regional development.<\/li>\n<li>Increased resilience against recurring drought conditions.<\/li>\n<\/ul>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img decoding=\"async\" src=\"https:\/\/encrypted-tbn0.gstatic.com\/images?q=tbn:ANd9GcQ1e7T8Oh66LsIh7p0oDyMYkeQXsE2wM-kCtcdNR8RQZQ&amp;s=10\" alt=\"Rajasthan Haryana Yamuna Water Project Agreement\" title=\"Rajasthan Haryana Yamuna Water Project Agreement\" \/><figcaption class=\"wp-element-caption\">Rajasthan Haryana Yamuna Water Project Agreement<\/figcaption><\/figure>\n<\/div>\n<h2 class=\"wp-block-heading\">Why This News is Important<\/h2>\n<h3 class=\"wp-block-heading\">Strengthening India\u2019s Water Security<\/h3>\n<p class=\"wp-block-paragraph\">The Rajasthan\u2013Haryana Yamuna Water Project Agreement is a significant development in India\u2019s efforts to ensure equitable distribution of water resources. Water scarcity remains one of the biggest challenges facing several states, especially in north-western India. By enabling the supply of Rajasthan\u2019s allocated share of Yamuna water, the agreement is expected to improve drinking water security for millions of people living in drought-prone districts. For competitive examinations, this development highlights the importance of sustainable water resource management and efficient utilization of interstate river waters.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h3 class=\"wp-block-heading\">A Landmark Example of Cooperative Federalism<\/h3>\n<p class=\"wp-block-paragraph\">One of the major reasons this news is important is that it demonstrates the principle of <strong>cooperative federalism<\/strong>, where the Central Government and state governments work together to resolve long-pending issues through dialogue and consensus. The agreement ends nearly three decades of delay in implementing the 1994 Upper Yamuna River Board Agreement. Such examples are frequently cited in UPSC, State PSC, and other government examinations while discussing Centre-State relations and intergovernmental cooperation.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h3 class=\"wp-block-heading\">Relevance to Water Resource Management<\/h3>\n<p class=\"wp-block-paragraph\">India faces increasing pressure on its freshwater resources due to rapid urbanization, population growth, climate change, and declining groundwater levels. This project promotes efficient water management through the use of underground pipelines, which reduce evaporation losses and improve water-use efficiency. The agreement also reflects the government\u2019s focus on modern water infrastructure and sustainable development, making it relevant for topics related to environmental conservation, disaster management, and climate resilience.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h3 class=\"wp-block-heading\">Importance for Rural Development and Public Welfare<\/h3>\n<p class=\"wp-block-paragraph\">The project is expected to provide reliable drinking water to several water-stressed districts of Rajasthan and Haryana, particularly the Shekhawati region. Improved access to clean water will enhance public health, reduce dependence on groundwater, support rural livelihoods, and improve the overall quality of life. Such infrastructure projects contribute directly to inclusive development and are important examples of welfare-oriented governance.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h3 class=\"wp-block-heading\">High Examination Relevance<\/h3>\n<p class=\"wp-block-paragraph\">This development holds considerable importance for aspirants preparing for <strong>UPSC Civil Services, State PSCs, SSC, Banking, Railways, Defence, CAPF, Police, and Teaching examinations<\/strong>. Questions may be asked on the following areas:<\/p>\n<ul class=\"wp-block-list\">\n<li>The <strong>1994 Upper Yamuna River Board Agreement<\/strong>.<\/li>\n<li>The concept of <strong>interstate river water sharing<\/strong>.<\/li>\n<li><strong>Cooperative federalism<\/strong> and Centre-State coordination.<\/li>\n<li>Water conservation through modern infrastructure.<\/li>\n<li>Sustainable Development Goals (SDGs), particularly <strong>SDG 6 (Clean Water and Sanitation)<\/strong>.<\/li>\n<li>Government initiatives related to water resource management and drinking water security.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">Students should also remember the beneficiary states, the purpose of the project, the use of underground pipelines, and its role in addressing water scarcity, as these facts are highly relevant for both preliminary and mains examinations.<\/p>\n<h2 class=\"wp-block-heading\">Historical Context<\/h2>\n<h3 class=\"wp-block-heading\">Evolution of Water Sharing in the Yamuna Basin<\/h3>\n<p class=\"wp-block-paragraph\">The Yamuna River is one of India\u2019s most important river systems and a major tributary of the Ganga. Flowing through several northern states, including Uttarakhand, Himachal Pradesh, Haryana, Delhi, Uttar Pradesh, and Rajasthan, the river plays a crucial role in providing drinking water, irrigation, and industrial water supply. As demand for water increased over the years, disputes regarding the allocation of Yamuna waters among the basin states also intensified, making a structured water-sharing mechanism essential.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h3 class=\"wp-block-heading\">The 1994 Upper Yamuna River Board Agreement<\/h3>\n<p class=\"wp-block-paragraph\">A major breakthrough came on <strong>12 May 1994<\/strong>, when the <strong>Upper Yamuna River Board (UYRB) Agreement<\/strong> was signed among the basin states under the supervision of the Government of India. The agreement aimed to distribute the available waters of the upper Yamuna basin in a fair and equitable manner among the participating states.<\/p>\n<p class=\"wp-block-paragraph\">The agreement allocated specific shares of Yamuna water to:<\/p>\n<ul class=\"wp-block-list\">\n<li>Haryana<\/li>\n<li>Uttar Pradesh<\/li>\n<li>Rajasthan<\/li>\n<li>Delhi<\/li>\n<li>Himachal Pradesh<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">To oversee the implementation of this arrangement, the <strong>Upper Yamuna River Board (UYRB)<\/strong> was established. Its primary responsibilities include monitoring water distribution, coordinating among the participating states, and ensuring compliance with the agreed allocations.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h3 class=\"wp-block-heading\">Delay in Implementation<\/h3>\n<p class=\"wp-block-paragraph\">Although Rajasthan received a defined share of Yamuna water under the 1994 agreement, the state could not fully utilize its allocation for nearly three decades. The primary obstacle was the absence of a dedicated infrastructure to transport water from the Hathnikund Barrage through the Western Yamuna Canal system into Rajasthan.<\/p>\n<p class=\"wp-block-paragraph\">Differences over project design, financial responsibilities, engineering challenges, and administrative coordination contributed to repeated delays. As a result, several districts in Rajasthan continued to rely heavily on groundwater despite having an allocated share of river water.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h3 class=\"wp-block-heading\">Growing Water Scarcity in North-Western India<\/h3>\n<p class=\"wp-block-paragraph\">Over the past three decades, Rajasthan and parts of Haryana have witnessed increasing water stress due to rapid population growth, urban expansion, declining groundwater levels, irregular rainfall, and the impacts of climate change. Regions such as <strong>Shekhawati<\/strong>, including Sikar, Jhunjhunu, and Churu districts, have faced recurring shortages of drinking water and excessive dependence on groundwater extraction.<\/p>\n<p class=\"wp-block-paragraph\">These challenges highlighted the urgent need to operationalize the long-pending Yamuna water allocation and strengthen regional water security through modern infrastructure.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h3 class=\"wp-block-heading\">Renewed Political Will and the Historic Agreement<\/h3>\n<p class=\"wp-block-paragraph\">The recent agreement between Rajasthan and Haryana represents the successful implementation of a long-pending commitment made under the 1994 Upper Yamuna River Board Agreement. With the support of the Central Government, both states agreed to construct the necessary pipeline infrastructure to transport Rajasthan\u2019s allocated share of Yamuna water.<\/p>\n<p class=\"wp-block-paragraph\">The project reflects India\u2019s growing emphasis on:<\/p>\n<ul class=\"wp-block-list\">\n<li>Cooperative federalism.<\/li>\n<li>Sustainable water resource management.<\/li>\n<li>Modern water infrastructure.<\/li>\n<li>Climate-resilient development.<\/li>\n<li>Long-term drinking water security for water-scarce regions.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">This historic agreement not only resolves a decades-old implementation challenge but also serves as a model for resolving interstate water issues through cooperation, dialogue, and institutional mechanisms rather than prolonged disputes.<\/p>\n<h2 class=\"wp-block-heading\">Key Takeaways from This News: <em>Rajasthan and Haryana Sign Historic Yamuna Water Project Agreement<\/em><\/h2>\n<h2 class=\"wp-block-heading\">Frequently Asked Questions (FAQs)<\/h2>\n<h2 class=\"wp-block-heading\">1. Why is the Rajasthan\u2013Haryana Yamuna Water Project Agreement in the news?<\/h2>\n<p class=\"wp-block-paragraph\">The agreement is in the news because Rajasthan and Haryana have signed a historic Memorandum of Agreement (MoA) to implement the long-pending 1994 Upper Yamuna River Board (UYRB) Agreement, ensuring the supply of Rajasthan\u2019s allocated share of Yamuna water.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">2. Which two states signed the Yamuna Water Project Agreement?<\/h2>\n<p class=\"wp-block-paragraph\">The agreement was signed between <strong>Rajasthan<\/strong> and <strong>Haryana<\/strong>.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">3. What is the primary objective of the Yamuna Water Project?<\/h2>\n<p class=\"wp-block-paragraph\">The primary objective is to provide Rajasthan with its allocated share of Yamuna water, improve drinking water availability, recharge groundwater, and ensure sustainable water management in water-scarce regions.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">4. What is the estimated cost of the Yamuna Water Project?<\/h2>\n<p class=\"wp-block-paragraph\">The estimated cost of the project is approximately <strong>\u20b934,102 crore<\/strong>.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">5. How much Yamuna water will Rajasthan receive under the project?<\/h2>\n<p class=\"wp-block-paragraph\">Rajasthan is expected to receive around <strong>580 Million Cubic Metres (MCM)<\/strong> of Yamuna water.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">6. Which agreement forms the basis of this project?<\/h2>\n<p class=\"wp-block-paragraph\">The project is based on the <strong>1994 Upper Yamuna River Board (UYRB) Agreement<\/strong>, which allocated Yamuna water among the basin states.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">7. Which districts are expected to benefit the most?<\/h2>\n<p class=\"wp-block-paragraph\">Major beneficiary districts include <strong>Sikar, Jhunjhunu, and Churu<\/strong> in Rajasthan and <strong>Bhiwani and Fatehabad<\/strong> in Haryana.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">8. Why are underground pipelines being used in the project?<\/h2>\n<p class=\"wp-block-paragraph\">Underground pipelines reduce evaporation losses, prevent water leakage and unauthorized diversion, improve water-use efficiency, and ensure sustainable water distribution.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">9. What is the significance of this agreement for competitive examinations?<\/h2>\n<p class=\"wp-block-paragraph\">The agreement is important for topics such as <strong>cooperative federalism, interstate river water disputes, water resource management, environmental conservation, sustainable development, and current affairs<\/strong>.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n<h2 class=\"wp-block-heading\">10. Which competitive exams can include questions on this topic?<\/h2>\n<p class=\"wp-block-paragraph\">Questions related to this development may appear in <strong>UPSC Civil Services, State PSCs, SSC CGL, SSC CHSL, Banking (IBPS\/SBI), Railways (RRB), CAPF, CDS, NDA, Police Recruitment, UGC NET, CTET, and other teaching examinations<\/strong>.<\/p>\n<h2 class=\"wp-block-heading\">Some Important Current Affairs Links<\/h2>\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/national\/\" target=\"_blank\" rel=\"noreferrer noopener\">State Current Affairs<\/a><\/div>\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/sports\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sports Current Affairs<\/a><\/div>\n<div class=\"wp-block-button is-style-outline is-style-outline--3\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/international\/\" target=\"_blank\" rel=\"noreferrer noopener\">International Current Affairs<\/a><\/div>\n<\/div>\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/banking\/\" target=\"_blank\" rel=\"noreferrer noopener\">Banking Current Affairs<\/a><\/div>\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/railway\/\" target=\"_blank\" rel=\"noreferrer noopener\">Railways Current Affairs<\/a><\/div>\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/defence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Defence Current Affairs<\/a><\/div>\n<\/div>\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--4\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs?newsmaticargs=custom&amp;posts=today\" target=\"_blank\" rel=\"noreferrer noopener\">Daily Current Affairs<\/a><\/div>\n<div class=\"wp-block-button is-style-outline is-style-outline--5\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairsinhindi\/\" target=\"_blank\" rel=\"noreferrer noopener\">Current Affairs In Hindi<\/a><\/div>\n<div class=\"wp-block-button is-style-outline is-style-outline--6\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/edunovations.com\/currentaffairs\/category\/news-and-notifications\/\" target=\"_blank\" rel=\"noreferrer noopener\">News and Notifications<\/a><\/div>\n<\/div>\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=com.edunovations.quiz\" target=\"_blank\" rel=\"noopener\"><img fetchpriority=\"high\" decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg\" alt=\"Download this App for Daily Current Affairs MCQ's\" class=\"wp-image-247\" title=\"Rajasthan Haryana Yamuna Water Project Agreement,Yamuna Water Project 2026,Upper Yamuna River Board,Rajasthan Yamuna water allocation,interstate water sharing India\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1.jpg 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-300x50.jpg 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/03\/Banner-current-affairs-2-1-768x128.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">Download this App for Daily Current Affairs MCQ\u2019s<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.martindiainfotech.com\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" width=\"900\" height=\"150\" src=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png\" alt=\"News Website Development Company\" class=\"wp-image-438\" title=\"News Website Development Company\" srcset=\"https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner.png 900w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-300x50.png 300w, https:\/\/edunovations.com\/currentaffairs\/wp-content\/uploads\/2023\/04\/News-Website-Development-Company-Banner-768x128.png 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/a><figcaption class=\"wp-element-caption\">News Website Development Company<\/figcaption><\/figure>","protected":false},"excerpt":{"rendered":"<p>Rajasthan Haryana Yamuna Water Project Agreement 2026 explained with key features, \u20b934,102 crore project details, 580 MCM Yamuna water allocation, &hellip; <br \/><a href=\"https:\/\/edunovations.com\/courses2\/rajasthan-haryana-yamuna-water-project-agreement-2026-key-features-benefits-significance-uyrb-agreement-and-exam-notes\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Rajasthan Haryana Yamuna Water Project Agreement 2026: Key Features, Benefits, Significance, UYRB Agreement and Exam Notes<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[209],"tags":[],"student-result":[],"class_list":["post-21902","post","type-post","status-publish","format-standard","hentry","category-current-affairs"],"acf":[],"_links":{"self":[{"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/posts\/21902","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/comments?post=21902"}],"version-history":[{"count":0,"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/posts\/21902\/revisions"}],"wp:attachment":[{"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/media?parent=21902"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/categories?post=21902"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/tags?post=21902"},{"taxonomy":"student-result","embeddable":true,"href":"https:\/\/edunovations.com\/courses2\/wp-json\/wp\/v2\/student-result?post=21902"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}